Completed and On-going Projects




Project Name Project Scope Employer/Client Year

Consultancy Services To Undertake Environmental
Survey For Olwiyo-Nimule 400 Kv Transmission Line Project

    Baseline Surveys for;
    • Air Quality Monitoring
    • Noise measurements
    • Surface Water sampling and Analysis

Electro Consult LTD Uganda

2024

Environment Consultancy services for Establishment of functional tree nursery beds,
development of nursery bed handbook, onsite training, provision of equipment, and technical support in Yumbe district local
government and Kululu sub-county

    Baseline Surveys for;
    • • Conduct desk reviews to understand suitable tree species based on the geographical condition of the district including the water supply, topography, soil quality, access and ownership of natural resources between males and females, refugees and nationals.
    • • Development of a detailed inception report following the initial consultations with the respective District technical team that is the department of natural resources, production and marketing and Sub County as well as RED project field staff.
    • • Design and selection criterion and profile existing individuals/groups/institutions interested in forest and agroforestry related activities in each selected project sub county to benefit from seedlings raised under this assignment.
    • • Development of a tree nursery bed handbook for the nursery managers, site workers and silviculture.
    • • Analyse the environmental aspects during the Establishment of a functional district tree seedling nursery bed with a supply of assorted items.
    • • selection of a suitable site for Establishment of a sub country tree seedling holding structure considering environmental sustainability
    • • Conduct onsite training (practical session) with a selected team at district and sub county levels in effective management of tree nursery bed
    • • Delivery of the raised tree seedlings from the district nursery bed to the sub county holding structure ready for pick up by the profiled farmers

Enabel

2023-2024

Environmental and Social Impact Assessment for the Expansion of Matugga Health Centre II to Matugga Health Centre III

    • • Air Quality Monitoring• Identify and Analyze the relevant regulations and clauses in the National Environmental regulations and National Environmental Statute among other legislation and regulatory framework which are applicable to the facilitiesNoise measurements
    • • Assessment of soils, air and water quality within the project area
    • • Assessment of soils, air and water quality within the project area
    • • Identification of environmental risks and impacts for facility including waste management issues, water pollution, dust emission, noise nuisance, soil erosion, impacts on land use and agriculture, loss of vegetation among others.

    • • Analysis of key impacts and preparation of an environmental and social management monitoring framework for identified risks and impacts

Nansana Municipal Council

2023

Environmental and Social Impact Assessment for the Expansion of Kirinya Health Centre II to Health Centre III

    • • Identify and Analyze the relevant regulations and clauses in the National Environmental regulations and National Environmental Statute among other legislation and regulatory framework which are applicable to the facilities
    • • Assessment of soils, air and water quality within the project area
    • • Identification of environmental risks and impacts for facility including waste management issues, water pollution, dust emission, noise nuisance, soil erosion, impacts on land use and agriculture, loss of vegetation among others.
    • .• Analysis of key impacts and preparation of an environmental and social management monitoring framework for identified risks and impacts

Kira Municipal Council

2023

District Environmental Action Plan for Terego District

    • • Developed the District Environmental Action Plan for Terego District it included;
    • • Identification of Stakeholders
    • • Analysis of the stakeholders
    • • Preparation of Engagement Plan for the stakeholder
    • • Stakeholder engagement in a view of identifying environmental challenges and sourcing of the action points/interventions form grass root
    • • Preparation of the District Environment Action Plan

Ecological Christian Organization ECO

2022

Environmental and Social Impact Assessment for Rain Tree Farm

    Baseline Surveys for;
    • • Obtain NEMA operating guidelines and checklist for similar organizations and/or operations
    • • Review the environmental impact of RTF’s operations against the NEMA standards Collect data from RTF for analysis.
    • • Consult with the local communities to ascertain the impact of RTF’s operations
    • • Clearly identify gaps to be rectified by the company including timelines and resources for addressing them
    • • Identify and develop mitigation measures for any exposures
    • • Prepare and issue impact assessment report

Raintree Farms Limited
P.O. Box 214, Masindi
E-mail: cs@raintreefarms.com

Null

Consultancy Services To Undertake Environmental
Survey For Olwiyo-Nimule 400 Kv Transmission Line Project

    Baseline Surveys for;
    • Air Quality Monitoring
    • Noise measurements
    • Surface Water sampling and Analysis

Electro Consult LTD Uganda

2024

Environment Compliance Audit for CIDI

    Carried out an Environmental Annual Compliance Audit in line with Ugandan National Environment Act;2019 and Audit Regulation 2020 requirements, including :
    • • Preparation of Audit criteria in line with the requirements of the Act and standard
    • Noise measurements
    • • Preparation of Audit criteria in line with the requirements of the Act and standard
      • environmental audit procedures;
    • • Review of EIA Certificate Conditions and those of other relevant Permits/approvals;
    • • Conduct site inspections, review on-site documentation;
    • • Review adequacy of strategies, plans and provide recommendations; and
    • • Compilation and submission of Audit report to Client.

Community Integrated Development Initiatives (CIDI)Uganda

2021

Environmental and Social Impact Assessment for Nshongi SHPP facility in Bunyangabo District

    Carried out an ESIA study including:
    • • Scoping study of the Project and preparation of ToR for the detailed ESIA; ‐ Completed
    • • Conducting detailed ESIA studies and identification of potential impacts;
    • • Collection of baseline data
    • • Stakeholder engagement
    • • Drafting of the mitigation measures for identified potential Project impacts;
    • • Preparation of Management and monitoring plans.
    • • Preparation of ESIA Report and follow‐up for approvals

Kanyabaha Hydro Power Plant Limited Uganda

2021

Decommissioning Plan for Faecal Sludge Management Plant and Biogas recovery Plant

    Prepared a decommissioning plan for Faecal sludge treatment Plant in line with the requirements of the National Environment Act 2019

Community Integrated Development Initiatives (CIDI) Uganda

2021

dentification of Permits required for development of Kanyabaha small hydropower Plant in Bunyangabo District

    Undertook review of Ugandan legislations to identify permits required for the Kanyabaha small hydropower Plant. A Permitting matrix associated with permits requirements for the construction industry was prepared

Kanyabaha hydro power LTD Uganda

2021

Environmental and Social Impact Assessment for Expansion of Eight Technical Institutions under Ministry of Education located in Namutumba, Kikuube, Pader, Yumbe, Lwengo, Kamuli, Amuria and Nakasongola districts

    Carried out an ESIA study including:
    • • Scoping study of the Project and preparation of ToR for the detailed ESIA; ‐ Completed
    • • Conducting detailed ESIA studies and identification of potential impacts;
    • • Drafting of the mitigation measures for identified potential Project impacts;
    • • Preparation of Management and monitoring plans.
    • • Preparation of ESIA Report and follow‐up for approvals

Pan Modern Consults Uganda

2020

Environmental and Social Impact Assessment for 13.6 KW Hydropower Plant and the associated Auxiliary Facilities - Rukungiri District

    Carried out an ESIA study including:
    • • Conducting detailed ESIA studies and identification of potential impacts;
    • • Collection of baseline data
    • • Drafting of the mitigation measures for identified potential Project impacts;
    • • Preparation of Management and monitoring plans.
    • • Preparation of ESIA Report and follow‐up for approvals

EPago Uganda Ltd Uganda

2020

Environmental Compliance Audit for Auromeera Industries Ltd

    Carried out an Environmental Annual Compliance Audit in line with Ugandan National Environment Act;2019 and Audit Regulation 2020 requirements, including:
    • • Preparation of Audit criteria in line with the requirements of the Act and standard environmental audit procedures;
    • • Review of EIA Certificate Conditions and those of other relevant Permits/approvals;
    • • Conduct site inspections, review on-site documentation;
    • • Review adequacy of strategies, plans and provide recommendations; and
    • • Compilation and submission of reports to Client.

Auromeera Industries Ltd Uganda

2020

Consultancy Services To Undertake Environmental
Survey For Olwiyo-Nimule 400 Kv Transmission Line Project

    Baseline Surveys for;
    • Air Quality Monitoring
    • Noise measurements
    • Surface Water sampling and Analysis

Electro Consult LTD Uganda

2024

Identification of Permits required for development of Mitano small hydropower Plant in Rukungiri District

    Undertook review of Ugandan legislations to identify permits required for the Mitano small hydropower Plant. A Permitting matrix associated with permits requirements for the construction industry was prepared:

Pago (U) LTD Uganda

2020

Final Mitigation Report for China Railway No.3 Engineering Group Co. Ltd

    • Compiled a Final Mitigation Report for Soroti –Moroto-Lokitanyala Road, Section 2, (Akisim – Moroto) (50.3 Km) in Napak & Moroto District in line with the Ministry of Works and Transport general specifications for road and bridge works, 2005, NEMA Conditions of approval, Contractors environmental and social management system Conduct audit/checks on Environmental issues, to identify both compliance and non-compliance items on all project’s auxiliary facilities for the Mubende-Kikagati Mubende Road

Electro Consult LTD Uganda

2024

Consultancy Services To Undertake Environmental
Survey For Olwiyo-Nimule 400 Kv Transmission Line Project

    Baseline Surveys for;
    • Air Quality Monitoring
    • Noise measurements
    • Surface Water sampling and Analysis

China Railway No.3 Engineering Group Co. Ltd Uganda

2020

Annual Environmental Compliance Audit China Communication Construction Co (CCCC)

    • Conduct audit/checks on Environmental issues, to identify both compliance and non-compliance items on all project’s auxiliary facilities for the Mubende-Kikagati Mubende Road

China Communication Construction Co (CCCC) Uganda

2020

Identification of Permits required for Nyanza Perch Industries

    • Undertook review of Ugandan legislations to identify permits required for the Nyanza Perch Industries (U) LTD. A Permitting matrix associated with permits requirements for the construction industry was prepared

Nyanza Perch (U) LTD Uganda

2019

Environmental and Social Impact Assessment for Mirani Cooking Oil Factory in Gobelo Wakiso District

    Carried out an ESIA study including:
    • • Scoping study of the Project and preparation of ToR for the detailed ESIA; ‐ Completed
    • • Conducting detailed ESIA studies and identification of potential impacts;
    • • Collection of baseline data
    • • Stakeholder engagement
    • • Drafting of the mitigation measures for identified potential Project impacts;
    • • Preparation of Management and monitoring plans.
    • • Preparation of ESIA Report and follow‐up for approvals

Mirani Oil Factory Uganda

2019

Annual Environmental Compliance Audit China Railway No.3 Engineering Group Co. Ltd

    Environmental, Health and Safety Annual Compliance Audit for Soroti –Moroto-Lokitanyala Road, Section 2, (Akisim – Moroto) (50.3 Km) in Napak & Moroto District:

China Railway No.3 Engineering Group Co. Ltd Uganda

2019

Annual Environment and Social Compliance Audit

    Carried out an Environmental Annual Compliance Audit in line with Ugandan National Environment Act; cap 153 and Audit Regulation requirements, including:
    • • Preparation of Audit criteria in line with the requirements of the Act and standard environmental audit procedures;
    • • Review of EIA Certificate Conditions and those of other relevant Permits/approvals;
    • • Conduct site inspections, review on-site documentation;
    • • Review adequacy of strategies, plans and provide recommendations; and Compilation and submission of reports to Client.

Electromax Uganda Limited

2018

Consultancy Services To Undertake Environmental
Survey For Olwiyo-Nimule 400 Kv Transmission Line Project

    Baseline Surveys for;
    • Air Quality Monitoring
    • Noise measurements
    • Surface Water sampling and Analysis

Electro Consult LTD Uganda

2024

Environmental Management Plan Formulation for WUSZ HOLDINGS (U) CO. LTD

    Prepared the Environmental Management Plan in line with the requirements of the National Environment Act; including: Decommissioning Plan, waste management plan, Health and safety management plan, Air Quality management plan, Blasting management plan, Noise management Plan, Traffic management Plan, Stockpile management Plan, Pollution Incidence Management Plan,;

WUSZ HOLDINGS (U) CO. LTD Uganda

2018

Environmental and Social Impact Assessment for Expansion of Auromeera Industries -Masese Jinja District

    Carried out an ESIA study including:
    • • Scoping study of the Project and preparation of ToR for the detailed ESIA; ‐ Completed
    • • Conducting detailed ESIA studies and identification of potential impacts;
    • • Collection of baseline data
    • • Stakeholder engagement
    • • Drafting of the mitigation measures for identified potential Project impacts;
    • • Preparation of Management and monitoring plans.Preparation of ESIA Report and follow‐up for approvals

Auromeera Industries (U) LTD Uganda

2018

Environmental and Social Impact Assessment for Collin Worker’s Camp-Hoima

    • Carried out an ESIA study including: :
    • • Scoping study of the Project and preparation of ToR for the detailed ESIA; ‐ Completed
    • • Conducting detailed ESIA studies and identification of potential impacts;
    • • • Collection of baseline data
    • • • Stakeholder engagement
    • • • Drafting of the mitigation measures for identified potential Project impacts;
    • • • Preparation of Management and monitoring plans.Preparation of ESIA Report and follow‐up for approvals

Wusz Holdings (U) Co. Ltd Uganda

2018